Extensive damage to subfloor and drywall.Removal of subfloor.Removal of drywall.Replace drywall with cement board and moisture resistant drywall.Newly tiled shower enclosure.Add GFI protection.Repaired receptical and switch.Installed new lighting and repaired  holes from old lighting.New tile floor and vanity.New bathroom paint.
Main Bath 1
Main Bath  2
Main bath had extensive water damage and customer did not like the current layout.Customer wanted a spa tub under the windowRemoved all drywall and floorind to reroute wiring, ductwork, water and sewer.Installed new tub, drywall and subfloor.New tile floor.New backsplash around spa tub.Custom front for garden tub for easy access to pump.New vanity, lighting and GFI circuits.
Select image for slideshow
Main Bath  3
Discouraged with the work of the previouse contractor, we we called to help.Installed new cement board for custom shower and rerouted plumbing.Custom tiled walls, floor, and glass block wall.Created custom floor pan for shower.Accent trim was added to walls.Custom flooring for shower.Beautiful new custom shower.